A Class C contractor license in Colorado is the residential general contractor license your city or county issues, usually after you pass the ICC Residential Building Contractor (C) exam. We checked what 22 cities and counties ask for, what the license costs and how much insurance it takes.

It is the residential class of general contractor license. In Denver it lets you build, add to, alter or repair one- and two-family homes and townhouses. Commercial buildings take a Class B or Class A license.
Colorado has no state version. DORA does not license general contractors, so the Class C license in Colorado is always a city or county license.
The unlimited class.
Colorado Springs adds apartment buildings of up to eight units and two stories. Longmont and Boulder set their own story limits.
Scope wording from Denver, the Pikes Peak Regional Building Department and Longmont.
Last checked November 2026. Cities change their rules, and this guide isn’t updated automatically. Confirm with your building department before you apply or book an exam.
Each name links to the page we read. Fees are for a new Class C license. The first 14 rows were read on November 13 and re-read on November 17, 2026. The last eight were added on November 17. Rules change, so confirm with the building department before you apply.
| City or county | What it calls Class C | Exam | Experience | License fee |
|---|---|---|---|---|
| Denver | Residential Contractor Class C | F13 on the city’s page. Denver also accepts the G13 | Two years of field work, in notarized letters | $250, plus $60 for the supervisor certificate |
| Aurora | Residential Building Contractor | ICC Residential Building Contractor “C”. The city’s flyer lists the G13 | Three job references | $235, plus $131 for the supervisor license |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | Building Contractor C (Home Builder) | G13 | Three references on permitted projects | $150, plus a $50 application fee |
| Fort Collins | Classes D1, D2 and E(R) | G13, 2018 code year or newer | Three verified projects | $300 for two years, supervisor certificate included |
| Arvada | Class C General Contractor | F13 at minimum, or a license from a Colorado city where you tested | Not stated | $100 a year |
| Thornton | Class C Residential Contractor | F13 or G13, or a reciprocal license | Not stated | $100 |
| Boulder | Class C | F13 or G13, per the city’s license guide | None stated | $197 a year |
| Loveland | Class C (Residential) | ICC Residential Building Contractor (C), or a reciprocal license | Not stated | $125 for two years |
| Longmont | Class C | An ICC certificate on the current code or one cycle back | A list of 10 to 12 past projects | $100 a year |
| Castle Rock | Class C: Residential Contractor | An ICC certificate, or a license from a city with a comparable test | Not stated | $150 a year |
| Jefferson County | Class C Contractor License | G13, passed within the past three years | None in years | $50 a year |
| Larimer County | Class C | G13, or a tested license from another Colorado city or county | Three completed projects or two years | $100 for two years |
| Centennial | General Contractor Class C | A Class C ICC test, or a current Aurora or Denver residential license | Without a test: three letters and five permitted jobs | $105 |
| Parker | Building Contractor Class C | G13 or F13 | Without a certificate: three letters and five permitted projects | $125 |
| Littleton | Class C | An ICC exam. No exam ID named | Not stated | $100, expires December 31 |
| Englewood | Class C | An ICC certification. No exam ID named | Not stated | $100 a year |
| Wheat Ridge | Residential General Contractor, Class 3 | A 2021 or 2024 ICC Class C test. The same line names the G13-N | Not stated | $125 |
| Commerce City | Class C | G13-N or F13-N, or a reciprocal license | Not stated | $60 |
| Brighton | Class C, Residential General Contractor | G13. Earlier code cycles are accepted | Competence shown to the building official | $75, plus a $15 registration fee |
| Broomfield | Class B, single-family dwellings | Not stated on the city’s pages | Not stated | $100 |
| Castle Pines | Class C | Proof of testing, or a license from a testing jurisdiction | Not stated | $125 |
| Boulder CountyUnincorporated areas | Class C | F13 passed within three years, or a listed jurisdiction’s license | Not stated | $250 for three years |
Not in the table: Lakewood, Westminster, Golden and Douglas County register or license contractors without an exam, Lone Tree issues no contractor license, and Greeley starts licensing on January 1, 2027. Our general contractor license in Colorado guide covers all 28.
Cities draw the residential line at different story counts, unit counts and construction types, so a project legal under one city’s Class C can need a Class B next door.
| City or county | Class C scope, in the city’s terms |
|---|---|
| Denver | One- and two-family homes, U occupancy buildings and townhouses |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | One- and two-family homes up to three stories, plus apartment buildings of up to eight units and two stories |
| Fort Collins | Class D1: single-family attached and detached homes with no more than two units, and townhouses |
| Boulder | Detached one- and two-family homes and townhomes up to two stories, Type V construction |
| Longmont | One- and two-family homes or townhouses up to three stories |
| Douglas CountyHighlands Ranch included | Single-family homes and duplexes |
| Centennial and Parker | Type III, IV and V construction in Group R-3 and Group U for residential use |
| Wheat Ridge | Single-unit homes, duplexes and townhomes up to three stories |
| Brighton | Residential buildings up to three stories |
| Lakewood | Class A-3 Residential: new construction, including remodels |
If your job sits near a line, send the building department the plans and ask which class it needs.
The test is ICC’s Residential Building Contractor (C) exam: 80 multiple-choice questions, four hours, open book, $120 at a Pearson VUE testing center. The 2018 edition, the G13, lists one book, the 2018 International Residential Code. You see your result when you finish.
÷
=
Denver and Boulder County name only this edition. Denver also accepts the G13.
The edition most cities name. Our class teaches it.
We are adding T13 exam prep.
Source: ICC contractor and trades bulletins, published October 12, 2026.
ICC says most contractor exams need at least 70% correct to pass. The 2021 editions come in a 70% and a 75% version, and ICC says the two are not interchangeable, so ask your city which one it accepts.
Our ICC G13 license exam prep page covers what you may bring into the room, how to book, and the retake rules.
Ask which class covers your work and the exact exam ID it accepts.
Learn where things live in the code book and tab it.
Passing gives you an ICC result. It does not license you.
Notarized letters, references or verified projects, depending on the city.
Send your result, experience, insurance and the fee.
Aurora’s exam sheet says passing an ICC exam is not a license to practice. Each city also sets its own rules for the experience paperwork. Denver will not take letters you sign yourself, Colorado Springs will not take a reference from a relative or spouse, and Fort Collins wants each project verified by someone outside your company.
Three costs add up: the exam, the license and any class you take. Insurance is separate. The table below adds the $120 exam to each city’s own fees for a new license.
| ICC exam | $120 each attempt |
|---|---|
| City license | $50 to $300, by city |
| Supervisor certificate | $60 in Denver, $131 in Aurora |
| Our G13 class | $2,499 with book, tab kit and portal |
| Retake wait | 10 days, set by ICC |
City fees from each building department. Exam fee from ICC’s 2018 bulletin.
| Where | Exam | City fees | Total before insurance | Term |
|---|---|---|---|---|
| Denver | $120 | $250 license and $60 certificate | $430 | Three years |
| Aurora | $120 | $235 license and $131 supervisor license | $486 | Supervisor license three years |
| Colorado Springs | $120 | $150 license and $50 application | $320 | One year |
| Fort Collins | $120 | $300 for license and certificate | $420 | Two years |
| Larimer County | $120 | $100 | $220 | 24 months |
| Jefferson County | $120 | $50 | $170 | 12 months |
Liability minimums run from $100,000 per person in Centennial to $1 million per occurrence in most of the Front Range. Buy to the highest number among the cities you work in, and have your agent name each city the way it asks.
| City or county | General liability minimum |
|---|---|
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department, Boulder and Littleton | $1 million per occurrence and $2 million aggregate. Boulder wants the city named as additional insured |
| Fort Collins | $1 million per person, $2 million per accident, $2 million aggregate |
| Longmont | $1 million combined single limit, $2 million aggregate, $2 million products completed |
| Loveland, Castle Rock, Larimer County and Parker | $1 million |
| Boulder CountyUnincorporated areas | $600,000 per occurrence |
| Douglas CountyHighlands Ranch included | $500,000 per occurrence for Class C |
| Wheat Ridge | $300,000 per occurrence, $600,000 aggregate |
| Commerce City | $300,000 |
| Centennial | $100,000 per person, $300,000 per accident, $25,000 property damage |
| Thornton and Golden | No certificate required |
| Denver, Aurora and Jefferson County | Not stated on the pages we read |
Workers’ compensation is a state rule. With one or more employees you must carry it, and the state can fine you up to $500 for each day without it. Boulder asks contractors with no coverage to file the state’s rejection of coverage form.
Our G13 class meets four Saturdays, 8:00 AM to 12:00 PM, in Lone Tree or Loveland, or fully online by live stream. We also hold classes in Colorado Springs. Licensed contractors who have passed the exam teach it.
We read each building department’s page for the city tables above and date every read, so you know which exam ID to book before you pay for it.
Often. One ICC pass can support several applications, and some cities accept a tested license from another Colorado city. Thornton lists 18 jurisdictions it accepts. Denver, Boulder, Longmont and Colorado Springs do not accept other cities’ licenses.
Ask your building department. Most cities in the table name the G13. The T13, on the 2021 codes, opens on December 1, 2026, and no city here names it yet. Wheat Ridge asks for a 2021 or 2024 test, and Longmont takes its current code or one cycle back, so those two may point you to the T13.
It depends on the city. Denver asks for two years of field work on homes, on projects from the last ten years. Aurora and Colorado Springs ask for three references, and Fort Collins asks for three verified projects.
Plan on the exam date plus the city’s review. Centennial says up to one business day, Arvada five, Jefferson and Larimer counties seven, Denver 14 to 20 business days for each of its two steps, and Colorado Springs about six to eight weeks.
Class C is for building homes. Class D is usually a single-trade license. Douglas County’s Class D covers garages, barns, basement finishes, decks and remodels, and Longmont’s Class D licenses need no test.
In some cities. Colorado Springs lets Class C build apartment buildings of up to eight units and two stories. Douglas County limits Class C to single-family homes and duplexes and puts three or more units in Class B.
Aurora wants notice within five business days. Colorado Springs gives you 30 days to qualify a replacement examinee.
You can prepare online, and many cities take applications online. The ICC exam is taken in person at a Pearson VUE testing center.
No. Colorado licenses electricians and plumbers at the state level, through DORA’s State Electrical Board and State Plumbing Board.
Know the code book well enough to find a section in under a minute. Our guide to passing the ICC G13 covers tabbing and practice.

See the class format, the locations and the price, then pick a start date.