A general contractor license in Colorado comes from the city or county where you build, because the state does not issue one. We read the rules for 28 Front Range cities and counties and put the exams, fees, insurance, reciprocity and renewal rules in one place.

Not a state one. DORA, the state agency that regulates licensed trades, lists general contractors among the occupations it does not license.
Each city or county sets its own classes, exam and paperwork, and you need a license or registration in each place you pull permits.
Last checked November 2026. Cities change their rules, and this guide isn’t updated automatically. Confirm with your building department before you apply or book an exam.
Most cities use the same three letters. The wording below is Denver’s. Other cities draw the Class B line by stories or construction type, and a few use their own letters. Broomfield, for one, puts single-family homes in Class B, and Wheat Ridge calls its residential class Class 3.
Exam family: ICC General Building Contractor (A), 90 questions in four hours.
Exam family: ICC General Building Contractor (B), 80 questions in four hours. See Class B contractor license in Colorado.
Exam family: ICC Residential Building Contractor (C), 80 questions in four hours. See Class C contractor license in Colorado.
Scope wording from Denver’s construction certificates page. Exam formats from ICC’s 2018 bulletin.
The exam and experience columns are for the residential class. Each name links to the page we read. Rules change, so confirm with the building department before you apply.
How the 28 cities and counties handle the residential exam. The first 19 were read on November 13 and re-read on November 17, 2026. The last nine were added on November 17.
| City or county | What it issues | Residential exam | Experience |
|---|---|---|---|
| Denver | Supervisor certificate, then a license. Classes A, B and C | F13 on the city’s page. Denver also accepts the G13 | Two years of field work, shown in notarized letters |
| Aurora | Contractor license plus a supervisor license | ICC Residential Building Contractor “C”. The city’s flyer lists the G13 | Three job references |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | License. Class C is called Home Builder | G13 | Three references, on permitted projects you supervised |
| Fort Collins | License plus a supervisor certificate. Residential classes are D1, D2 and E(R) | G13, 2018 code year or newer | Three verified projects |
| Lakewood | Registration only | None required | Listed on the form |
| Arvada | License. Classes A, B and C | F13 at minimum, or a license from a Colorado city where you tested | Not stated |
| Thornton | License. Classes A, B and C | F13 or G13, or a reciprocal license | Not stated |
| Westminster | Registration, one general category | Not stated | Not stated |
| Boulder | License. Classes A, B and C | F13 or G13, per the city’s license guide | None stated for Class C |
| Loveland | License. Classes A, B and C | ICC Residential Building Contractor (C), or a reciprocal license | Not stated |
| Greeley | None today. Required from January 1, 2027 | Not published yet | Not published yet |
| Longmont | License. Classes A, B and C | An ICC certificate on the current code or one cycle back | A list of 10 to 12 past projects |
| Castle Rock | Registration. Classes A, B and C | An ICC certificate, or a license from a city with a comparable test | Not stated |
| Douglas CountyHighlands Ranch included | Registration only | No test | Not stated |
| Jefferson County | License. Classes A, B and C | G13, passed within the past three years | None in years |
| Larimer County | License. Classes A, B and C | G13, or a tested license from another Colorado city or county | Three completed projects or two years |
| Centennial | License. Classes A, B and C | A Class C ICC test, or a current Aurora or Denver residential license | Without a test: Three letters and five permitted jobs |
| Parker | License. Classes A, B and C | G13 or F13 | Without a certificate: Three letters and five permitted projects |
| Lone Tree | None. The city does not license contractors | None | None |
| Littleton | License. Classes A, B, C and specialty | An ICC exam. No exam ID named | Not stated |
| Englewood | License. Classes A, B, C and D | An ICC exam when the city asks for one. No exam ID named | Not stated |
| Wheat Ridge | License. The residential class is Class 3 | A 2021 or 2024 ICC Class C test. The same line names the G13-N | Not stated |
| Commerce City | License. Classes A, B and C | G13-N or F13-N, or a reciprocal license | Not stated |
| Brighton | License. Classes A, B and C | G13. Tests on earlier code cycles are accepted | Competence shown to the building official |
| Golden | License, one per trade, no classes | None. Golden does not test | Not stated |
| Broomfield | License. Single-family homes fall under Class B | Not stated on the city’s pages | Not stated |
| Castle Pines | License. Classes A, B, C and D | Proof of testing, or a license from a testing jurisdiction | Not stated |
| Boulder CountyUnincorporated areas | License. Classes A, B and C | F13 passed within three years, or a license from a listed jurisdiction | Not stated |
Longmont adopted the 2024 codes on July 1, 2026 and accepts certificates on its current code or one cycle back. That points to the 2021-code exams, so ask Longmont before you sit a 2018 exam. Wheat Ridge names two different exams in one line, so ask which one it means.
Fees are for a new residential license. Insurance is the general liability minimum the city states. Where a cell says “not stated”, the pages we read do not say, so ask before you buy a policy.
| City or county | Residential license fee | Liability insurance | Term |
|---|---|---|---|
| Denver | $250 license, plus $60 for the supervisor certificate | Not stated on the city’s pages | Three years. Renew from 30 days before expiry to one year after |
| Aurora | $235 license, plus $131 for the supervisor license | Not stated for building contractors | Supervisor license, three years. License term not stated |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | $150, plus a $50 application fee | $1 million per occurrence, $2 million aggregate | One year. Renew within 45 days of expiry without a new exam |
| Fort Collins | $300 for the license and supervisor certificate | $1 million per person, $2 million per accident and aggregate | Two years, then a 60-day grace period |
| Lakewood | $150 the first year, then $400 for each three-year renewal | A certificate is required. Amount not stated | One probation year, then three years |
| Arvada | $100 | Not stated | The page says both “every year” and “whenever you have work” |
| Thornton | $100 | Not required since February 13, 2023 | One year |
| Westminster | $110 | Not stated | Not stated |
| Boulder | $197 a year | $1 million per occurrence, $2 million aggregate, city named as additional insured | One year. Renew up to 30 days early |
| Loveland | $125 | $1 million | Two years. No reminders are sent |
| Greeley | Not published yet | Not published yet | Starts January 1, 2027 |
| Longmont | $100 | $1 million combined single limit, $2 million aggregate | One year, plus a code quiz once per code cycle |
| Castle Rock | $150 a year | $1 million | One year |
| Douglas CountyHighlands Ranch included | $150, waived in unincorporated areas since 2013 | $500,000 per occurrence for Class C | One year |
| Jefferson County | $50 | Not stated | 12 months. Apply up to three months early |
| Larimer County | $100 | $1 million | 24 months |
| Centennial | $105 | $100,000 per person, $300,000 per accident, $25,000 property damage | Not stated |
| Parker | $125 | $1 million | Not stated |
| Lone Tree | No contractor license. A $10 business license that does not expire | Not stated | No renewal |
| Littleton | $100 | $1 million per occurrence, $2 million aggregate | Every license expires December 31 |
| Englewood | $100 | Not stated | One year |
| Wheat Ridge | $125 | $300,000 per occurrence, $600,000 aggregate | Not stated |
| Commerce City | $60 | $300,000 | Not stated |
| Brighton | $75, plus a $15 registration fee | $1 million for injury or death to one person, plus other limits | 12 months |
| Golden | $100 per trade | No certificate required | Not stated |
| Broomfield | $100 | $300,000 per person, $300,000 per occurrence, $50,000 property damage | One year |
| Castle Pines | $125 | A certificate is required. Amount not stated | One year |
| Boulder CountyUnincorporated areas | $250 | $600,000 per occurrence | Three years |
Workers’ compensation is a state rule. If you have one or more employees in Colorado, you must carry it. A construction contractor with no employees must be covered too, unless they formally reject coverage. The state can fine you up to $500 for every day you are uninsured.
Some cities accept another city’s tested license in place of the exam. You still apply and pay in each place.
| City or county | Accepts a license from |
|---|---|
| Thornton | Arvada, Aurora, Boulder, Centennial, Commerce City, Denver, Englewood, Fort Collins, Jefferson County, Littleton, Longmont, Louisville, Loveland, Grand Junction, Park County, Pikes Peak Regional, Sterling and Wheat Ridge. You still apply for a Thornton license |
| Wheat Ridge | Aurora, City of Boulder, Colorado Springs, Denver, Fort Collins, Pikes Peak and Park County. Supervisor licenses are not accepted |
| Boulder CountyUnincorporated areas | A license from its listed jurisdictions, which include Brighton, Commerce City, Denver, Englewood, Golden, Lakewood, Littleton, Thornton and Wheat Ridge |
| Commerce City | Denver, Aurora, Pikes Peak, Arvada and other jurisdictions with matching qualifications |
| Centennial | A current Denver or Aurora license |
| Jefferson County and Larimer County | A license from any Colorado city or county that required a passing ICC exam |
| Arvada, Castle Rock and Castle Pines | A license from a city that tests. Castle Rock wants it in the name of the person who tested, not only the company |
| Parker | A license from a jurisdiction the building official finds substantially similar |
| Loveland | A license from a reciprocal city. The list is sent by email only |
| Littleton | A reciprocal license until it expires. After that you need a current ICC exam |
| Denver, Boulder, Longmont and Colorado Springs | None. Each says it does not accept other jurisdictions’ licenses |
| Brighton | None for ground-up work unless you held that level of Brighton license before |
Cities that test use ICC’s National Standard contractor exams. Each ICC exam is open book, costs $120 and is taken at a Pearson VUE testing center. The letter in the exam ID is the code edition.
Denver and Boulder County name only this edition, and Denver also accepts the G13. Arvada, Thornton, Parker, Boulder and Commerce City still list it.
The edition most cities in the table name.
Sold in a 70% and a 75% passing score version. No city in the table names it yet.
The residential exam is shown. Class B is the F12, G12 and T12, and Class A is the F11, G11 and T11. Source: ICC contractor and trades bulletins, published October 12, 2026.
ICC’s 2015 bulletin says the 2014 and 2015 exams “will be retired and will no longer be available for registration” on December 1, 2026. ICC has published no retirement date for the G series.
The 70% and 75% versions of each new exam are separate exams, and ICC says they are not interchangeable. A pass on the wrong one may not count.
We read all 28 building department sites again on November 17, 2026. None had posted a notice about the change or named a T-series exam. If your city names an F-series exam, ask what it will accept before you register. Our ICC T13 exam guide covers the new edition.
The exam and the code you build to are often different years. Twelve of the 19 places below now enforce the 2024 International Residential Code, while the G13 most of them name is written on the 2018 IRC. Study the exam’s book for the test, then learn your city’s edition and amendments for the job. Most of these places have also adopted a wildfire code, which covers roofing, siding and vents in the areas it applies to.
| City or county | Residential code (IRC) | In effect | Colorado Wildfire Resiliency Code |
|---|---|---|---|
| Denver | 2024 | Adopted June 13, 2025 | Adopted, as Appendix T of the Denver Building Code |
| Aurora | 2021 | Not found | Not found |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | 2021 | June 30, 2023 | Colorado Springs from June 30, 2026. El Paso County for applications from July 1, 2026 |
| Fort Collins | 2024 | Permits submitted from April 1, 2026 | Adopted, with city amendments |
| Lakewood | 2021 | June 30, 2023 | Adopted, effective October 21, 2026 |
| Arvada | 2024 | July 1, 2026 | Its own code based on the state code |
| Thornton | 2024 | July 1, 2026, per the building page | Not found |
| Westminster | 2021 | June 1, 2024 | Not found |
| Boulder | 2024 | August 1, 2025 | Uses the 2024 International Wildland Urban Interface Code. State code adoption not found |
| Loveland | 2024 | July 1, 2026 | Its own 2026 wildfire code |
| Greeley | 2021 | January 1, 2023 | Not found |
| Longmont | 2024 | July 1, 2026 | Adopted July 1, 2026 |
| Castle Rock | 2024 | June 30, 2026 | Adopted, effective July 1, 2026 |
| Douglas CountyHighlands Ranch included | 2024 | July 1, 2026 | Its own county code, July 1, 2026 |
| Jefferson County | 2024 | July 1, 2026. The 2018 codes ran until June 30 | Its own county code, for permits from July 1, 2026 |
| Larimer County | 2024 | January 1, 2026 | Adopted |
| Centennial | 2021 | 2023 | Adopted, effective June 30, 2026 |
| Parker | 2024 | June 30, 2026 | Adopted |
| Lone Tree | 2021 | Not found | Adopted in April 2026 |
Read on each jurisdiction’s own site on November 17, 2026. Douglas County’s contractor registration page still lists the 2021 codes, while its adopted codes page lists the 2024 codes from July 1, 2026. The nine places added to the license table on November 17 were not checked for code year.
A license covers one city or county. List every place you plan to pull permits.
Class C for homes, Class B or A for commercial work. Check each city’s wording.
Ask each building department for the exact exam ID and passing score it accepts.
One ICC pass can support several applications. You see your result when you finish.
Send the result, experience letters or project lists, insurance and the fee.
Where a city states no review time, ask.
| City or county | Where you apply | Stated review time |
|---|---|---|
| Denver | Online through e-permits, by mail, or in person at 201 W. Colfax Ave. | About 14 to 20 business days online, for the certificate and again for the license |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | Online, by email, fax, mail or in person | About six to eight weeks. Everything is due three weeks before the monthly Licensing Committee |
| Fort Collins | In person, or by email to [email protected] | Not stated |
| Arvada | The Arvada Permits site | Reviewed within five business days |
| Thornton | The CityView portal only | Not stated |
| Boulder | The Customer Self-Service portal | Three to five business days to issue |
| Loveland | By email to [email protected], PDF files only | Complete applications are processed on Wednesdays |
| Longmont | Accela Citizen Access, or by email | Not stated |
| Douglas CountyHighlands Ranch included | In person or by mail, also fax or email | Two business days once complete |
| Jefferson County | Online, in person at 100 Jefferson County Pkwy, by email or mail | A license or written denial within seven business days |
| Larimer County | Online | A license, provisional license or written denial within seven business days |
| Centennial | The Self-Service Portal, or work stations at 13133 E. Arapahoe Rd. | Up to one business day |
| Parker | Not online. Call 303-841-1970 to set up an account | Not stated |
These are the reasons the cities themselves give.
| City or county | What gets an application returned or denied |
|---|---|
| Denver | Illegible or incomplete applications are not accepted. Experience letters must be notarized and signed by the owner or controlling officer of a company you worked for, or by customers. Letters from your own officers, members or subcontractors do not count, and you cannot be your own reference. A second denial starts a six-month wait. |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | Pages 4 to 11 of the application must be complete. A reference cannot be a relative, spouse or PPRBD employee, and you must have supervised every project you list. Your business name must match Secretary of State records exactly. Papers sent after the 10-day deadline leave the file incomplete. |
| Fort Collins | Incomplete packets are not accepted. Project verifications must come from someone not affiliated with you, and not from suppliers. A passing exam score does not guarantee a class without the experience paperwork. |
| Boulder | The city says its most common error is a certificate of insurance that does not list the City of Boulder as additional insured. |
| Douglas CountyHighlands Ranch included | The insured name must match the company name, and the county reads the per-occurrence amount, not the aggregate. The certificate must be signed and dated by an agent. |
| Castle Rock | A tested license must be in the name of the person who tested. A license in the company’s name only is not accepted. |
| Centennial | If your insurance is cancelled, a new certificate is due within ten days or the license is revoked. |
| Jefferson County | A denial lists its reasons. You can reapply after 90 calendar days. |
Denver runs two steps. You, or someone you employ, earns a supervisor certificate by passing the ICC exam and documenting experience. Then the company applies for the contractor license. Denver does not accept license applications until the certificate is approved.
Once the certificate application is approved, you have 90 days to send the official ICC pass letter and pay the fee. If someone other than an owner or officer is the supervisor, the company sends a letter on letterhead naming them Supervisor of Record.
Denver does not accept contractor licenses or certificates from other cities, counties or states. Our Denver building department Q&A has the office’s own answers on the residential license.
| Class C experience | Two years of field work on homes |
|---|---|
| Class B experience | Four years building commercial buildings |
| Class A experience | Seven years, including high-rise work |
| How it is shown | Notarized letters. You cannot be your own reference |
| Fees | $250 for the license, $60 for the certificate |
| Review time | About 14 to 20 business days online |
| Renewal | Every three years |
From Denver’s construction certificates, application and fee pages.
None of the 28 sites we read lists continuing education hours for general contractors. Longmont’s code quiz is the closest thing.
| City or county | What to know at renewal |
|---|---|
| Denver | Renew the supervisor certificate first. Expired licenses renew only in person or by mail, and the city mails no notices. After one year expired, the license needs a new application. A certificate expired under three years needs a new application but no new exam; after three years, new letters and a new exam. |
| Colorado Springs and El Paso CountyPikes Peak Regional Building Department | Renew within 45 days of expiry without a new exam. Late penalties grow from half the fee to twice the fee by day 180. After 180 days you reapply and retest. Only the examinee can renew. |
| Longmont | Renew every year, and once per code cycle send a quiz completion certificate. The quiz is the city’s own online test, 25 questions for Class C. An ICC certificate from the current code cycle can replace it. |
| Loveland | A license expired or inactive more than three years needs proof of a passed ICC exam to renew. |
| Thornton | Renew from 30 days before expiry up to one year after. Later than that, apply as new. |
| Jefferson County and Larimer County | Building code violations older than 90 days must be resolved before you renew. Larimer emails a reminder three months ahead. |
We run ICC exam prep classes in Lone Tree, Loveland and Colorado Springs, and every class can be taken fully online by live stream. Licensed contractors who have passed the tests teach them.
The city table on this page is our own work. We read every building department’s page, link it and date it, so members and students know which exam to book before they pay for one.
In most, yes. Each city or county issues its own. Some accept a tested license from another Colorado city in place of the exam, including Arvada, Castle Rock, Centennial, Commerce City, Larimer County, Loveland, Thornton and Wheat Ridge. Denver, Boulder, Longmont and Colorado Springs do not.
Choose the cities you will work in, pass the ICC exam for your class, document your experience, and apply to each building department with insurance and the fee.
It depends on the city. Centennial says up to one business day, Douglas County two, Arvada five, and Jefferson and Larimer counties seven. Denver says 14 to 20 business days for each of its two steps, and Colorado Springs about six to eight weeks.
It is open book, and the clock is the hard part. The residential exam gives you about three minutes a question, and ICC warns you will not have time to look up every answer. Our guide to passing the ICC G13 covers how to study.
Not that we can find. ICC says its contractor exams are given through Pearson VUE, and Pearson’s ICC contractor page offers testing centers only. ICC’s remote PRONTO program covers “many” exams but does not name the contractor exams.
Not for a building license in the cities we checked. Aurora and Littleton list a bond only for right-of-way work in streets and sidewalks.
There is no statewide lookup for general contractors, because the state does not license them. Check with the building department of the city or county where the job is.
No. Lone Tree does not issue or require contractor licenses. Everyone on a permit needs a Lone Tree business license, which costs $10 and does not expire.
It comes from the Pikes Peak Regional Building Department, which covers Colorado Springs and El Paso County. Class C, called Home Builder, takes the G13, three references, $1 million in general liability and a $150 license fee plus a $50 application fee.
Fort Collins issues a license plus a supervisor certificate for $300 on a two-year term. Its residential classes take the G13, 2018 code year or newer, and three verified projects signed by someone not affiliated with you.
Aurora’s Residential Building Contractor license takes the ICC Residential Building Contractor “C” certification and three job references. The license fee is $235 and the supervisor license is $131. If your supervisor leaves, you must tell the city within five business days.

See the next G13 and G14 class dates in Lone Tree, Loveland and online.